Neighborhood Planning
CNA-City Relations
"New Urbanism" "Smart Growth" Zoning
| Overview | Chronology | Contacts | Links | More... |
|
* * * Austin Neighborhood Planning Newsletter (scroll down -- the link is at the bottom) *** Upper Boggy Creek Neighborhood Plan |
| P&Z Committee Chair elaborates on Building Permits and Variances |
| SF-3 is the Zoning category that applies to almost all residential
properties in our area, which simply limits the occupancy to single family
residences and, where there is at least 7000 square feet, duplexes and
small detached residences ("Granny Flats or Garage Apartments); and for
which certain code requirements are triggered. I think the "NP" is a newly
imposed designation and refers to the fact that City Council has adopted
the Upper Boggy Creek Neighborhood Plan, which 5 neighborhoods, including
Cherrywood, comprise.
Here is the problem, and I want to be honest with you about what my own position may be on this, apart from what may be the position of others. To my knowledge, there are basically three reasons for side yard setbacks (which are usually 5 feet, measured inward from the side property line. They are: (1) Utility easements. These easements are there to allow public or private utility companies to place and maintain various utilities. If you have one, you most likely will not be able to get this variance, even if the Neighborhood were to support you. Sometimes such easements exist but have no functional purpose; i.e. the electrical, telephone, gas, water, sanitary sewer or storm sewer line(s) for which they were intended were never placed or have been relocated. In these cases it is sometimes possible to have the easement vacated, and this can be a lengthy process (but worth it). If you have a survey of your property, it should show the easements, but sometimes they only show up after a variance request such as this triggers a search by the various city departments. (2) hen both residences build up to the setback, there is still always 10 feet between the vertical structures, and even if both structures have the maximum intrusion of roof overhangs into the setback (24"), there is still 6 feet between overhangs. Since most residential construction supports combustion, this means that fire can much more easily spread from one residence to another when these setbacks are not observed. This becomes especially important when one or both of the residences is unoccupied and thus there is no one to notice the fire when it starts. One remedy to this, in lieu of disallowing intrusions into the side yard setback is to require that any construction that occurs there to consist of noncombustible materials. With a carport, for instance, this could mean steel or aluminum columns, beams, joists, deck and roof. (3) To allow visual surveillance and access by law enforcement officers. Police use the spaces between buildings to see back into properties when they are looking for perpetrators of crimes; some who might be fleeing, others who may be trying to break in or peep in to residences. They can be more effective in catching bad guys and preventing break-ins when they can at least see, and preferably enter, these spaces between buildings. I think that this particular feature of setbacks is often defeated by legal privacy fences and thus is not usually cited as a basis for denying a variance, but it is one that the applicant and the adjacent neighbor need to consider when deciding whether to seek a variance to allow construction in a side yard. Of course a completely open (i.e. without walls) carport, if that is what you propose, would not violate this function of a setback. I personally favor the densification of the neighborhood and thus am personally not opposed to building closer together as long as the fire safety concerns and police surveillance issues can be accommodated in some way. But I do not get to decide these things, and some folks in the neighborhood do not agree with me on this. If you were not aware of these bases for the side yard setbacks, I hope this information is of help. As I mentioned, if your neighbor is in support, I think this would weigh heavily in the consideration of the Committee and The Neighborhood in whether to support the variance, as would consideration of the applicability of the functional considerations I mention above. -Girard Kinney (Chair, P&Z)- ~ ~ ~ |
| Planning and Zoning Committee Meeting Minutes for Thursday, August 23, 2001 (Mike Damal notes) |
| Girard Kinney, Dorothy Wade, Brian Block, and Mike
Damal Attended.
Three topics were discussed--Upper Boggy Creek planning efforts, Austin Energy substation, and anonymous letter received by the committee. The efforts of the Upper Boggy Creek planning team were
discussed. MD stated he overall highly supported the efforts of the team,
although he has not been greatly involved due to scheduling conflicts.
He noted the planning teams seem to be directed to get the neighborhood
to ““approve”” higher density development--he is not directly opposed to
this, his main concern is for quality ““street friendly”” development.
MD is of the belief that market forces will drive the density--we should
try to influence the quality and character (street, neighborhood friendly)
development. MD stated he thought the CNA’’s development guidelines should
be at a minimum, incorporated into the Cherrywood section of the UBC design
guidelines. The committee voted unanimously to recommend CNA’’s development
guidelines be introduced to the UBC design guidelines. GK stated that such
guidelines should be codified and be enforceable to protect the neighborhood
from unwanted development. The committee was in general agreement on all
aspects talked about in this area. GK and MD both emailed Lynn Estabrook
about their desires to be active in the design development guidelines.
|
| AUSTIN ENERGY'S Fiesta substation: Design Conference notes. PDF (100KB) |
| AUSTIN ENERGY's Fiesta electric substation. <Judy.Fowler@austinenergy.com> |
| The following is in response to Gordon's
e-mail of June 18. As I wrote to Gordon yesterday, I have just finished
up a project that took me out of commission for a couple of days. We will
see everyone on Friday at Asbury.
Judy 1. [gb]
AS WE DISCUSSED AT THE LAST MEETING, THE LAYOUT OF THE SUBSTATION PROPER CANNOT CHANGE BECAUSE OF THE EQUIPMENT AND SITE LIMITATIONS. OUR UNDERSTANDING WAS THAT LARS WOULD WORK ON COMING UP WITH ELEVATIONS OF THE BUILDING AND WALL ALONG THE LINES PRESENTED TO AUSTIN ENERGY AT THE LAST MEETING. LARS WILL BE WORKING WITH THE ABB STRUCTURAL ENGINEER TO MAKE SURE THAT EVERYTHING IS COORDINATED. LARS UNDERSTANDS AND THINKS IT IS APPROPRIATE THAT THIS IS AN ENGINEERING PROJECT AND HE IS COORDINATING HIS WORK ON THAT BASIS. WE HAD A PERIOD OF TIME THAT LARS CONTRACT WAS BEING DISCUSSED AND AUSTIN ENERGY HAD TO USE PUBLIC WORKS TO SECURE AND NEGOTIATE THAT CONTRACT. LARS CONTRACT WAS NOT FULLY SIGNED UNTIL THE END OF APRIL. 2. [gb]
LARS KNOWS THAT ABB IS AVAILABLE AND I KNOW HE IS WORKING WITH THEIR ENGINEERS. HE IS COORDINATING WITH THE LANDSCAPE PERSON TO ASSURE THAT THE LANDSCAPING COMPLIMENTS THE DESIGN. AS GIRARD KNOWS BEN TURNER IS NO LONGER A PART OF THE TEAM AND TRENTON WON WAS NOT SELECTED AS THE ARCHITECT. AS YOU WILL REMEMBER LARS ATTENDED THE LAST MEETING ALTHOUGH HE HAD NOT BEEN FORMALLY HIRED. 3. ]gb]
WE STILL EXPECT THE NEIGHBORHOOD TO HAVE INPUT. CAPITAL METRO FINALLY RESPONDED TUESDAY MORNING AND THEY DO NOT WANT A BUS STOP THAT CLOSE TO I-35 BUT WOULD ENTERTAIN IMPROVEMENT IN THE ONE FURTHER WEST. AUSTIN ENERGY WILL WORK TOWARD THAT GOAL UNLESS THE NEIGHBORHOOD DOES NOT WANT ANY IMPROVEMENT IN THE BUS STOP. HOPEFULLY THIS WILL ASSURE YOU AND GIRARD THAT EVERYTHING IS BEING COORDINATED. THE REASON WE HAVE NOT REQUESTED ANY FURTHER MEETINGS IS THAT LARS DID NOT HAVE ANY DESIGNS READY TO BE SHOWN. AUSTIN ENERGY PERSONNEL, LARS STANLEY, ABB, AND THEIR CONTRACTORS ARE ALL WORKING TOWARD HAVING A STELLAR PROJECT. ALL OF US WANT THIS TO BE AN AWARD WINNING PROJECT. |
| On another note I called into Zoning Enforcement an illegal duplex that was offered for rent at 3203 1/2 Cherrywood. Julie Wilkinson is the owner at 626-8693. I met with Julie today asking to look at the duplex (a bargain--one bedroom for only $900/month!), and then stated my intensions/concerns as a neighbor. I gave her a copy of zoning 101, development guidelines, and the letter CNA sent to David Desliva concerning the illegal activity at 3809 Cherrywood. Hopefully she will be getting permits soon for a "duplex conversion"--allowed on her lot, however most of the "work" has already been "completed". |
| I recieved a call today from Margot Brown at 3101 Robinson--she is requesting a variance for a garage apartment at her residence. I am sending her the development guidelines, approval form, and vision statement tomorrow. I have amended our letter to ask for both renter and owner approval within 200 feet and also that we have all materials three weeks prior to any city hearing. (these two points were agreed to at our last meeting). I will let you know if/ when I get any info back--she said they have a tentative hearing date mid April. |
| First, two Calendar entries (finally settled, after
some changes):
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
CNA PRE-CHARRETTE MEETING
Now, what’s going on – why a “charrette?”...
Austin Energy (AE) has contracted with ABB T& D Inc., a big
AE’s Judy Fowler says they want this project to be exemplary, for us as
This corner may be an eyesore (Party Stop, Pinky’s, Short Stop) but it
Imagine a corner with greenery, a pleasing GIS, and perhaps a landmark
Enter the Dark Force...
ABB could fulfill its contract by doing nothing more than dropping its
Which gets us to the Charrette (a collective design idea-sharing
If indeed a mindless minimalist engine is running, I am virtually
If the ABB side sends a senior Architect who is willing to design
If they send a factotem, and show no interest in real design, those of
You are invited to participate...
ABB’s proposed site layout is viewable as JPEG or PDF at
|
| A 1-hour meeting was held Feb 9 (Fri) with Austin Energy attended by:
- Judy Fowler (AE Public Involvement & Real Estate Services Manager) - Allen Small (AE Project Manager for this substation) - Mike Damal (CNA Planning & Zoning Committee Chair) - Gordon Bennett (CNA Web-butt) v------------------------- Highlight Reel ----------------------v
WHO?
DESIGN
TO BE NEGOTIATED LATER
TIMETABLE
WHO?
DESIGN
LATER
|
| (Aug 3) DIAZCARL@aol.com
writes:
I have contacted the city of Austin Building and Permitt Enforcement Dept in Austin (Ms. Paula Hawkins, Area Inspector, (512) 499-2404). She has verified that Mr. DeSilva has pulled permits but has never had inspectors approve any of the improvements. The permits which were issued were not for the development and/or modification associated with converting a single family home into a duplex. Also, Mr. DeSilva has not followed through with the required inspections for which the permits were originally pulled for. Ms. Hawkins mentioned that he cannot have the duplex occupied until appropriate inspections are complete and once a certificate of occupancy is obtained. Ms. Hawkins has been very helpful and would appreciate your concerns to be voiced to her. Carlos Diaz (Aug3) jack@jackjoseynewman.com writes I just talked to Mr. Desilva on the phone, and strongly suggested that he contact the CNA president (that's you, Jim), and arrange a face-to-face meeting with members of the SC. I gave him Jim's number, and let him know that a prompt meeting would be greatly preferrable to weeks and months of hostility towards his project. He was asked to explain his answer, if any, to the parking implications, among other issues. Jack Newman (00Aug2) Mdamal@aol.com writes In this weekend's Statesman an ad for a 4 bedroom 3 bath duplex at 3809B Cherrywood was run, for rent for $1500/mo. This is the house on the NE corner of 38 1/2 and Cherrywood, the one with all the blocks out front for many months... The owner, David DeSilva has illegally converted the downstairs area even after neighbors have complained and the city inspectors have warned him... Please EVERYONE please call the ad at 789-6584 and voice your concern over this illegal activity. This is someone who is adding a total of 8 bedrooms for rent, which legally requires 8 parking spaces offstreet. This house does not have this type of parking and the overflow parking will most likely go on Cherrywood, since there is no parking allowed on that part of 38-1/2... I plan on calling the city zoning department and ask you to do the same. Please let me know your concerns and let me know if/when you call and the response you get... David is also the owner of Mango's on Guadalupe--any thoughts of a boycott/protest there??? Let me know what you think... Thanks, Mike Damal |
| Gordon Bennett,
Girard Kinney, Jim Walker, Steven Kreger, Mark Lind, and Mike Damal
attended.
The neighborhood planning process was discussed in some detail. MD reported and supplied information on the process and what other neighborhood are doing with their neighborhood plan (Hyde Park, Old West Austin, Chestnut). Last Friday, MD went to the city and talked with Steve Barney on the process. He was told that Gina Kopic will be assigned to Cherrywood as our planner, and we will probably start in the "late summer/early fall" timeframe. It was noted that although this timeframe was stated any number of factors could delay it. I asked Gina and Steve what we could do to prepare for this, and the two things they said were to build awareness and start surveying/inventorying the neighborhood. The Cherrywood neighborhood plan will incorporate an area larger than the current boundaries of CNA. It will also include the Wilshire Woods and Dellwood II neighborhoods to the north and the Blacklands neighborhood to the south. It was noted that CNA must work with and not alienate these areas. These action items were decided concerning the neighborhood plan 1. It was determined the best initial course of action was to start a preliminary inventory of the neighborhood and increase awareness of the neighborhood planning process. 2. JW has volunteered to do the prep work for a map of the neighborhood, compatible with city guidelines, that can be used for the survey/inventory work. 3. GK and SK have volunteered to provide the organization/process of for the survey/inventory of the neighborhood. Presently the city’s maps are outdated and do not show the proper location of business, garage apartments, sidewalks, curb cuts, etc... Volunteers will be needed to help in this effort. GK and SK will write an article for the next Flea asking for volunteers and explaining the neighborhood planning process. 4. GK is in contact with Blacklands, Wilshire Woods, and Delwood II concerning I-35 issues-- he will communicate our initial intentions on neighborhood planning, invite them to all of our meetings, and encourage them to take similiar actions. The land at the former Value Sky Park was discussed. This is a 5.7 acre plot current zoned mostly LI (light industrial). The land directly south of this site is presently being rezoned CS-MU-CO (general commercial services, mixed use, conditional overlay) through the Rosewood and Chestnut neighborhood plans. It is thought that the best chance for rezoning will occur when we get our neighborhood plan. It was determined a proactive approach is the best way instead of being reactive to what might be built there. It is stated in planning commission minutes that any change in use for the site must go to the planning commission. MD will draft a letter to the current owner stating our concerns for development with the site, providing them a copy of our vision statement and development guidelines. [TCAD has the owner of 2900 Manor listed as 2900 MANOR LTD, 7303 SAN PEDRO, SAN ANTONIO TX 78216-6225, right south of Central Park Mall near the airport. As of 00Apr, land is appraised at $244,000, improvements at $380,000. /gb] No new info was provided on Austin Energy transformer site. We will attempt to contact Judy Fowler to find out the progress of site acquisition/design/development. |
|
1. In about 5 years' time they will run out of space and leave
2. They are NOT asking the City for any change in 1107's zoning -- no
3. They ARE planning to remodel the house at 1107 for use as "Safety
4. As the property's new owners, CAC acted first to clean it up.
Today
5. Construction is underway, and what will come out is a vastly
___________________________
This block across the street from
the Avalon Apartments and the Children's Advocacy Center has two
"residential" lots. 1105 was bought in 1996 by Richard Linklater
of Detour Productions. 1107 was bought in 1997 by CAC (before then it had
been the trashiest
|
| 1.
Once the only big picture around was the TPSD’s “Growth Watch.” http://www.ci.austin.tx.us/growth/ 2. Then came the “Sustainable Communities Initiative.” http://www.ci.austin.tx.us/sustainable/contents.htm 3. ... Which spawned the “Sustainable Indicators Project.” http://www.centex-indicators.org/index.html 4. Next was the Central Texas Visioning Project http://www.envisioncentraltexas.org/index.php (ECT) http://www.envisionutah.org/ (Envision Utah) 5. Now is added “Livable City.” http://www.liveablecity.org/ |
|
POB 6515, Ithaca NY 14851 Visit the following sites with connections to the New Urbanism : ORGANIZATIONS
|
|
|
The Cherrywood Neighborhood Association is committed to:5. Gordon Bennett's Vision Retreat 2 notes 99Jun26
* Safe, walkable streets;
* Neighborhood-oriented and neighborhood-friendly businesses and services;
* Preserve and promote public and private greenspaces;
* Respect, recognize and maintain ethnic, family, socioeconomic and cultural diversity;
* Managing growth while ensuring livable density, a diversity of architectural styles, and a well maintained neighborhood;
* Achieving a sense of community and security by encouraging responsibility, involvement and pride among all residents and owners;
* Healthy and active relationships with other neighborhood groups, civic organizations and government agencies;
* A built environment compatible with the above goals.
| Facilitator Pat Grigadean
< Pat Grigadean > drilled
us in "interest-based" conflict resolution. Basically this means,
first, patiently isolate important interests that need to be satisfied,
then find available solutions that do that best. Five steps:
1. CLARIFY ISSUES. Not just
"traffic" but obstacles to improving traffic:
2. IDENTIFY INTERESTS (as opposed
to general arguments for or against).
3. GENERATE OPTIONS (short-term and/or
long-term).
4. EVALUATE OPTIONS in light of interests.
The problem resolves to which options (a-f) best satisfy the most interests
(1-5).
5. DEVELOP A PLAN (specifying time
horizons for each step).
It's looks deceptively simple, even obvious, but most discussions of controversial problems do not proceed this way, and typically do not work nearly as well .... |
6. 30Sep99 ELECTRICAL SUBSTATION PROPOSED IN NEIGHBORHOOD Girard Kinney)
In early September CNA investigated a rumor that a sale of Pato's Tacos on 38th½ had fallen through due to a pending sale of the property abutting Pato's to the west (the auto parts store).
In response to his inquiry, CNA president Jim Walker received a letter from Charles Manning, Director of Austin Energy "in behalf of the Mayor and Council" confirming that indeed they (Austin Energy) were trying to buy the property, and that after they had bought it and drawn up plans they would let us see what was proposed. This seemed so threatening to CNA's adopted Vision that we called an emergency Steering Committee Meeting Sunday, 12 September, where we made several decisions, and actions have been taken with regard to each of them:
We contacted City Council offices directly, leaving messages expressing our strong objection to this process, and urging a redirection from Council. Jim contacted Council Members directly, and got a good response from Jackie Goodman, whom we are optimistic will play the the role as our "champion" if necessary. Jim got us on the 07 October Council Agenda under Citizens' Communication, to provide us an audience before council. Jim would immediately send a letter, signed by him on behalf of the Steering Committee, to Charles Manning, responding to his letter, and requesting that they halt the process of trying to purchase this property immediately, and that they then meet with us to plan a new strategy with us involved from the get go. He got a fast response in the form of a willingness to meet with us that Friday.
Girard and Jack Newman (Jack is not currently a Steering Committee, but was drafted by Jim to help with these tasks) crafted a letter to the Mayor and Council, to be signed by all 13 of the Steering Committee Members, alerting Council to this objectionable process of Austin Energy and insisting that we be involved in this crucial decision.
We had three basic objectives: (1)we wanted to understand a lot more about this facility, (2)why it is needed, (3)why in our neighborhood. If it does, indeed, need to be in our neighborhood, we wanted to be an informed partner in it's placement and design; and we wanted for this to establish an emphatic precedent for the City to enlist our input in any such processes and decisions in the future.
Girard & Jack prepared their letter with input from most of the Steering Committee (special thanks to Priscilla Boston, Mark Lind and Pauline Porter for their substantial contributions), it was signed by all on Wednesday and delivered to Mayor, Council, City Manager and Mr. Manning on Thursday.
At 3:00 p.m. Friday, 17 September the first meeting with Austin Energy happened at their headquarters at Town Lake Center. The Steering Committee was represented by a task force consisting of Mark Lind, Girard Kinney, Jack Newman and Jim Walker. Austin Energy was represented by Mario A. Espinoza, Director of Government Relations, Judith E. Fowler, Public Involvement & Real Estate Services Manager, Clint A. Rogas, Jr. P.E., Process Manager, Power Delivery.
The following items comprise the significant points of discussion during the meeting: (1)They (Austin Energy) have made an offer for the property to Mr. Rogan Giles (Garwald), who has now initiated his own appraisal of his property, and who they expect will probably make some kind of counter proposal when he complete his appraisal. (2)The area served by Austin Energy is a finite area (not geographically expanding) that is becoming denser and is using more energy all the time. (3)This facility is needed to improve the distribution capability to keep up with this urban growth, and is necessary in addition to any facility that might be built in the future at the Mueller site (they are looking at a site on or near the National Guard site at Mueller for that additional facility).
Mr. Rogas promised to provide us the following week a description of the geographical boundaries within which this facility must be located, although it was not clear then that this facility really has to be within our neighborhood at all. We pressed the point that the peripheries of neighborhoods, (and seams between neighborhoods) seem more appropriate locations for facilities that are not appropriate in their centers. We also emphasized that there is land that is already industrially zoned that seems much more appropriate. We decided not to examine specific sites, but rather to try to establish mutually agreed upon criteria for them to use in their selection process, and then for us to review proposed sites for conformance to the criteria.
We raised specific concerns, many of which had been points in our letter to Mayor and Council (of which we made sure they all had a copy). We emphasized that a substation at their proposed site would take up a valuable commercial site and would be about 100 feet from School property. We expressed concerns about visual aesthetics (fence, razor wire, industrial equipment, etc) and noise, and we discussed the impact on Pato's and in inappropriateness of an industrial use on 38th½.
When asked directly, Ms Fowler committed, and the others concurred with her commitment, that even if they receive an acceptance or counter offer on the 38th½ Street property, they will not move on it until they have met with us, and allowed us to be a part of a site selection process. They agreed to have another meeting the following week, bringing input from their planning department and technical requirements for the facility, to aid in a site selection exercise in which we will participate.
We gave them our upcoming schedule; including our Steering Committee meeting on 27 September (at which we could formally adopt a recommendation for the General Meeting), the Flea deadline on about 01 October (in which we will have an article describing where we are on this issue), and the General CNA Meeting on Wednesday 27 October, 1999, at which the neighborhood can take a vote if necessary.
Jim expressed our thanks for their cooperative spirit and commitments, told them about the fact that he had already signed up to speak at the next Council meeting. He assured them that he would use that opportunity to let Council know how cooperative Austin Energy has been now that they know of our concerns. He made the point that we were a task force appointed by the Steering Committee, and that we would be taking this before the entire neighborhood for their vote.
The following Friday, 24 September, we again met with them at the same location. This time, Austin Energy was represented by Judy Fowler and Mario Espinoza, and CNA was represented by Jim Walker, Mark Lind and Girard
7. 99Nov21 Planning&Zoning
Committee meeting
(Mike Damal 478-9622 Mdamal@aol.com)
Attending: Mike McClendon, Mark Lind, Jim
Walker, Girard Kinney, Steven
Kreger, Mike Damal
~~~~~~~begin 11/21 p&z notes~~~
DAY CARE CENTER -- MD
said that notices were sent containing our 8 Point guidelines and
neighbor notification to the owner and agent of the property at 2807
Robinson. The property is applying for an conditional use permit
for a commercial day care center. Discussion centered on that
day care centers are a good thing, but perhaps this was not the best
location in the neighborhood for another one. Committee will
wait and see how the immediate neighbors feel and wait for the site
plan to see the exact nature of the day care center before forming
an opinion. GK mentioned that neighbors should be given CNA's "8 Points"
guidelines when developer asks for owner approval in developing the
site--committee decided a new approval form will be developed incorporating
the 8 points and the owner's signature and comments. MD will
have a draft form by the next meeting.
CHILDREN'S ADVOCACY CENTER -- MD said next meeting with the CAC will be Dec 2nd at 5:45 pm. Discussion centered on last letter sent to the CAC citing legal uses under for SF3 zoning and that office use is not one of them. We hope to get a more definitive response from CAC this time with more expertise on zoning matters. A draft questionnaire was shown poling the neighbors on their views. After much discussion, MD stated this questionnaire was to find out actual documentable opinion on the subject, up to now all we have is hearsay information. MM suggested that an "other" category be offered to the 4 questions, and GK said the "8Points" should be given with the questionnaire also. Both suggestions will be added. JW said we should have this info by the Dec 2 meeting. (I will be available to canvas this thanksgiving weekend if anyone else is available, I'd appreciate the help--MD)
ELECTRIC SUBSTATION — JW stated we still have not heard from Austin Energy concerning the last letter. JW said he will try to call Judy Fowler to obtain more info. It was concluded another letter should go out "to a higher level" including Austin Energy's board and council to suggest a process for dealing with this. Austin Energy will be doing a lot more of these stations in the future, and CNA would like to establish a precedent in how the neighborhood interacts with Austin Energy in design and site selection. Also there is an individual with the city (name?) who should act as a liaison between AE and neighborhood groups, and we should get this person involved also.
P&Z COMMITTEE COMMUNICATIONS -- ML and others mentioned what the P&Z should be involved in with neighborhood issues, MD requested everyone send emails among the committee of what P&Z should/should not do in regards to various issues--these can be further discussed at the next meeting.
REALTORS & DUPLEXES
-- MD mentioned Realtors are marketing properties in the neighborhood as
"easy duplex conversions" which may not be. MD will draft a
letter to Realtors stating what is needed for a typical duplex conversion
and that they do not misrepresent the property. Letter will
be available by next meeting.
~~~~~~~end 11/21 p&z notes~~~
~~~~ 00Feb28 ~~~~
Below is the draft fax to be sent today
to Austin Energy [Judy Fowler and Mario Espinosa]:
Dear Judy and Mario,
We are currently preparing a response to the Feb. 11, 2000 letter for Austin Energy Director Charles Manning, and want to thank you for any role you had in helping to generate that letter. More immediately however, and in preparation for our meeting on Wednesday, the Cherrywood Neighborhood Association Planning and Zoning Committee has come up with a following list of questions we wish to be discussed at the meeting. We would also prefer written responses.
1. In the Feb 11, 2000 letter from Mr. Charles Manning, he wrote that the new GIS substation is "extremely safe and reliable." We would like some information to substantiate this claim, including: a. documented safety record of GIS substations by current users b. safety guidelines required in the design and manufacture of these facilities c. personnel in Austin Energy who are assigned to safety concerns of these facilities over the operational life of the facility In the future we may want to request that an individual such as a safety engineer from Austin Energy meet with our neighborhood association (preferably at one of our general meetings) to educate our membership on the safety and reliability of this new technology.
2. Mr. Manning also wrote in his letter that "substation engineers need to know the size and dimension of a location before they create a layout." We realize that detailed information cannot be provided until a final site is chosen, however we require that non-site specific information be provided so we can have a better idea of the facility needed to be built. We imagine that such information was utilized in drafting the two sample layouts provided by Judy in December, 1999. We have been asking for this type of narrative for several months, the type of information we have been requesting includes: a. rough dimensions of the actual GIS equipment needed (the footprint of the equipment) b. how often servicing is required to this equipment c. how large and what turning radius is required for the servicing vehicles and trucks d. does the entire layout need to be oriented to truck access in a particular way e. does the entire layout need to be oriented to the transmission lines in a particular way f. what level of noise is emitted from these sites g. to what height does the equipment rise, and similarly, typical height of a privacy wall With such information we can better determine the suitability of sites throughout our neighborhood.
3. Mr. Manning also wrote that "Austin Energy is committed to building a structure that will be acceptable to your neighborhood," which is of course what we want as well. To that end, we request that: a. AEU and CNA try to improve the ongoing process of our involvement in the initial site selection b. AEU describe the process that will be used to involve the CNA in the design of the facility once a site is selected
We realize that you are under time constraints and we wish to work with you as expeditiously as possible. Because this information can be of a technical nature, we request to have written documentation of all information provided so we can have this information available to our
Thank you again for your time,
~~~~